Will my power be off all day?
For a board change, expect three to five hours without supply, usually late morning to mid-afternoon. We set up one live socket on a temporary arrangement first, so a fridge, a router or a work laptop can keep running. On a rewire, power is off in the area being worked on and restored to the rest of the property each evening.
Do I need a full rewire or just a new board?
The board is the part you can see; the cable decides. If insulation resistance on the existing circuits tests well and the cabling is PVC rather than rubber or fabric, a board change plus a couple of repairs is usually the right job. We test before quoting a rewire, and we will tell you when the cheaper answer is the correct one.
Can you fit an EV charger on an older supply?
Often yes. Two things get checked first: the earthing arrangement at the incoming supply, which decides whether a device with built-in protection is needed, and the total load. If the main fuse is small, a charger with load management will simply charge more slowly when the shower is on rather than tripping the house. If the supply genuinely cannot carry it, we say so at survey, not after installing.
Do you make good after chasing walls?
Chases are filled and rubbed back flush so the wall is ready to decorate, and floorboards are refitted with screws. We do not skim entire walls, re-tile or paint. If a job needs a plasterer afterwards we will tell you at quote stage so you can line one up rather than discover it on the last day.
What is an EICR and when do I actually need one?
An Electrical Installation Condition Report is an inspection and test of the fixed wiring, with observations coded by severity. It is normally wanted when letting a property, at sale, after a flood or fire, or when nobody can remember the last test. It is a report, not a repair — you receive the coded findings plus an itemised remedial quote you are free to take elsewhere.
Can you work around tenants or a home office?
Yes, and it is worth telling us at enquiry stage. Occupied jobs are planned in smaller stages with a fixed daily finish time and a kept-live socket agreed in advance. Where there are calls or lessons happening, we schedule the chasing and drilling into agreed windows and do the quiet second-fix work around them.